Loop might yet become a loop

I think I’m having a flashback.

Some years ago, I heard the arguments for and against rerouting Loop 335, aka Soncy Road, a bit farther west to create an actual loop around Amarillo’s western edge.

Then the discussion ended.

It’s being revived, as the Texas Department of Transportation is considering a costly and comprehensive reworking of the so-called loop into something that would create a traffic bypass around what’s become one of the busiest commercial corridors in the city.

http://amarillo.com/news/latest-news/2014-10-15/txdot-wants-redo-loop

It’s going to cost hundreds of millions of dollars. It’s going to be the result, presumably, of a lengthy round of public hearings in which the city and the state will receive comment from affected individuals.

Good luck with this one, ladies and gentlemen.

Loop 335, as one of the commenters noted in the online post attached to this blog, isn’t really a loop the way Loop 289 is in Lubbock. Loop 289 was built correctly the first time, with limited access roadway encircling the city. If you miss your appointed exit in Lubbock, all you have to do is stay on the loop, circle the city and exit the loop. It’ll take some time, but it’s a sure-fire way to get pointed back in the direction you want.

Here? Well, we don’t have that kind of thoroughfare.

It’s developed along Soncy. Head east where Loop 335 makes the turn south of the city and development begins to thin out when you get past Washington Street. The rest of the 40-some-mile-long loop is relatively vacant of the commercial development you see on Soncy.

I recall hearing that TxDOT wanted to create some limited-access roadway along the southern edge of the city. Maybe that will help.

Now there might be a connection with the westernmost route along Loop 335, if it gets extended.

I’m not holding my breath waiting for this improvement. Still, I wish everyone at TxDOT and City Hall well.